Installed Capacity
1,04 MW
Purchase Price
1.423.004 USD
Project Summary
Located in the Çal district of Denizli, Kaynar-1 SPP is one of Blume Metal Kimya’s sustainable production investments in the energy sector. The project was acquired in 2021, and the energy revenues generated from production have been reflected in Blume’s balance sheet as of 2022.
Transfer Date
Transfer Date
Operational Date
Ocak 2022
Reliable Investment in Renewable Energy
Kaynar-1 Solar Power Plant (Denizli – Çal)
Kaynar-1 SPP, which is among the energy production investments of Blume Metal Kimya, was acquired on November 11, 2021, in the Çal district of Denizli.
The Transition from Investment to Production Process
This facility, with a capacity of 1.04 MW within Kaynar Enerji A.Ş., was purchased for 1,423,004 USD (including land cost and 18% VAT), and its transfer, along with connection rights, was completed as of December 2021.
As of January 2022, energy revenues began to be reflected in the company's balance sheet.
